Dubai - Construction of 39-storey Goldcrest Executive Tower comprising residential, office, leisure and retail components.
January 25, 2010 |
|
Abu Dhabi - Design and construction of Radisson SAS Hotel comprising (370) rooms and associated facilities.
January 25, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract for the construction of a 230-kilometre-long, multi-products pipeline to link Ruwais with Mussafah and Abu Dhabi city.
January 25, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract for setting up Base Lube Oil production facilities with capacity of 300,000 tonnes per year of Very High Viscosity Index (VHVI) base oil at Ruwais, including a hydro-cracker, a sulphur recovery unit and isomerisation de-waxers.
January 25, 2010 |
|
Dubai - Supply of printed matter for the Central Warehouse of a health authority.
January 25, 2010 |
|
Abu Dhabi - Construction, maintenance and re-design work for healthcare centres.
January 25, 2010 |
|
Northern Emirates - Supply and installation of digital X-ray equipment for a Preventive Medical Centre.
January 25, 2010 |
|
Abu Dhabi - Construction, maintenance and re-design work for healthcare centres.
January 25, 2010 |
|
Dubai - Supply of tyres for a petroleum company.
January 25, 2010 |
|
Al Ain - Provision of consultancy services for the development of Municipality Stores.
January 25, 2010 |
|
Abu Dhabi - Provision of a Resource Management System at Abu Dhabi International Airport.
January 25, 2010 |
|
Abu Dhabi - Provision of a Flight Information Display System at Abu Dhabi International Airport.
January 25, 2010 |
|
Northern Emirates - Design and construction of two towers comprising (44) storeys and (31) storeys, including a five-star hotel and a two-storey shopping mall.
January 25, 2010 |
|
Abu Dhabi - Provision of an Airport Operational Database, Information Broker and Data Warehouse at Abu Dhabi International Airport.
January 25, 2010 |
|
Al Ain - Carrying out comprehensive electromechanical maintenance, rehabilitation and addition works at the buildings of a sports & cultural club.
January 26, 2010 |
|
Abu Dhabi - Carrying out maintenance, rehabilitation, additions and minor works of internal roads for a municipality.
January 26, 2010 |
|
Abu Dhabi - Carrying out maintenance, rehabilitation, additions and minor works of internal roads for a municipality.
January 26, 2010 |
|
Northern Emirates - Supply of bulk liquefied petroleum gas (LPG) / Propane and Diesel for supplying to a copper rod plant regularly on rate contract basis.
January 26, 2010 |
|
Abu Dhabi - Printing and supply of annual training scheme/plan for the year 2010 to a ministry.
January 26, 2010 |
|
Northern Emirates - Supply of chemicals and various industrial materials for a gold refining company.
January 26, 2010 |
|
Dubai - Construction of Park Towers comprising two residential buildings, each consisting of (46) storeys offering one-three bedrooms, including leisure and entertainment facilities like swimming pool, health club, gymnasium, steam room, sauna, Jacuzzi and tennis court.
January 26, 2010 |
|
Dubai - Carrying out improvement and upgrading works of Al Ittihad road.
January 26, 2010 |
|
Abu Dhabi - Construction of a medical complex offering Dentistry, Dermatology, Paediatrics and general practice medicine facilities.
January 26, 2010 |
|
Abu Dhabi - Construction of 35-storey, five-star Grand Corniche Hotel comprising (349) rooms, (90) suites, (144) furnished serviced apartments, boutique retail podium, business centre, a spa and health club, swimming pool and restaurants.
January 26, 2010 |
|
Abu Dhabi - Design and construction of Blue Dolphin Centre comprising a ground plus seven-storey building consisting of office suites, retail centres and associated facilities, which will form part of a beach complex development project.
January 26, 2010 |
|
Dubai - Design and construction of 29-storey Michael Schumacher Business Avenue, including three-storey basement parking, mezzanine and ground.
January 26, 2010 |
|
Abu Dhabi - Development of infrastructure facilities that will cater for approximately (374) high-rise buildings across 3 parcels of land, including construction of access roads and the set up of other infrastructural components, consisting potable water, sewage & drainage and telecommunication aspects.
January 26, 2010 |
|
Abu Dhabi - Construction of several hundred metres long road tunnel comprising a number of lanes running in each direction within the Capital Centre development.
January 26, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract covering the replacement of a 60-kilometre-long, 42-inch-diameter offshore crude oil pipeline.
January 26, 2010 |
|
Abu Dhabi - Design and construction of two buildings, the first comprising a courthouse, while the second comprising a prison for a judicial authority.
January 26, 2010 |
|
Al Ain - Carrying out primary bulk earthworks and enabling works, including construction of retaining wall structures for a tourism development authority.
January 27, 2010 |
|
Abu Dhabi - Development of Motor World comprising showrooms, motor accessories, outlets, maintenance facilities, a three-star hotel, office spaces, a residential building, a retail podium and restaurants, including infrastructure works such as roads, water, sewage, electrical and telecommunication networks.
January 27, 2010 |
|
Dubai - Design and construction of 23-storey F Tower comprising residential apartments as well as commercial spaces, including associated facilities.
January 27, 2010 |
|
Abu Dhabi - Design and construction of headquarters for Abu Dhabi Islamic Bank comprising (2 Nos.) 12-storey buildings connected by an atrium and a four-storey basement.
January 27, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract for the development of Tacamool petrochemicals complex comprising a combination of olefin, aromatics and fertilizer production facilities.
January 27, 2010 |
|
Abu Dhabi - Design and construction of five-star Westin Hotel comprising (149) rooms, including conference and associated facilities.
January 27, 2010 |
|
Al Ain - Carrying out comprehensive civil maintenance, rehabilitation and addition works at the buildings of a sports & cultural club.
January 27, 2010 |
|
Abu Dhabi - Provision of engineering consultancy services for redesigning the Main Building of a civil aviation authority.
January 27, 2010 |
|
Abu Dhabi - Supply of Enterprise SMS Solutions for a hospital.
January 27, 2010 |
|
Abu Dhabi - Supply of Information Technology (IT) equipment for the new Education Centre at a hospital.
January 27, 2010 |
|
Abu Dhabi - Construction of (75 Nos.) high-quality villas ranging from 3 to 6 bedrooms within Saadiyat Beach Golf Course area.
January 27, 2010 |
|
Abu Dhabi - Supply and installation of Tea and Coffee vending machine for a hospital.
January 27, 2010 |
|
Abu Dhabi - Design and construction of three-storey shopping mall comprising (700) stores, including associated facilities, as part of Yas Island development project.
January 28, 2010 |
|
Abu Dhabi - Design and construction of 26-storey Falcon Tower comprising four offices on each floor, including associated facilities.
January 28, 2010 |
|
Northern Emirates - Design and construction of Mashrabia Towers comprising (2 Nos.) 25-storey buildings consisting of (800) residential apartments.
January 28, 2010 |
|
Abu Dhabi - Procurement, installation, commissioning and start-up of two stand-by power plants at an international airport consisting of combustion turbine generators with a total load of up to 140 MW and fast-start reciprocating engines with a total load of up to 10 MW.
January 28, 2010 |
|
Northern Emirates - Development of Eye of Ajman scheme offering a total of 109 plots that can accommodate buildings ranging from ground floor + five storeys of parking + (17) upper storeys to ground floor + nine storeys of parking + (60) upper floors.
January 28, 2010 |
|
Dubai - Development of four theme parks on an island, including resort hotels, spas, shopping districts and restaurants.
January 28, 2010 |
|
Abu Dhabi - Carrying out maintenance of two buildings for a public works authority.
January 28, 2010 |
|
Al Ain - Carrying out replacement of external cladding for housing buildings at a university.
January 28, 2010 |
|
Abu Dhabi - Implementation of e-authority project for a pension & social security authority.
January 28, 2010 |
|
Dubai - Installation of low-voltage cables, mini distribution pillars and drilling under the roads for an electricity & water authority.
January 28, 2010 |
|
Northern Emirates - Carrying out maintenance and addition works of branch stores for the building of an educational authority.
January 28, 2010 |
|
Dubai - Development of The Crystal mixed-use scheme comprising twelve villas covering an area of 254 to 336 square metres, a hotel apartment complex consisting of 238 units of various sizes, 192 standard rooms, studios, 18 deluxe rooms, 16 suite rooms as well as 12 lofts.
January 28, 2010 |
|
Abu Dhabi - Design and construction of 30-storey Sky Gardens waterfront tower comprising residential apartments and villas.
January 28, 2010 |
|
Abu Dhabi - Development of Saadiyat island, which calls for infrastructure works, including site preparation and earthworks, roads, bridges, water and electricity grids and possibly a light rail system linking the island with the mainland.
January 30, 2010 |
|
Dubai - Construction of U-Bora Towers comprising a 52-storey office tower, a 17-storey residential building and a five-level podium.
January 30, 2010 |
|
Dubai - Design and construction of 9-storey Wave Residence 1 Tower comprising garden apartments with private pools.
January 30, 2010 |
|
Dubai - Design and construction of Emirates Gardens 2 comprising three buildings, each consisting of two ground floors plus four upper storeys, offering studio, one and two-bedroom apartments, including associated facilities.
January 30, 2010 |
|
Abu Dhabi - Construction of a new state-of-the-art stadium comprising approximately 65,000 seats.
January 30, 2010 |
|
Abu Dhabi - Development of Najmat Abu Dhabi scheme comprising three districts, including a range of 40-storey and 50-storey mixed-use towers that will surround the retail and entertainment district, with two iconic 80-storey buildings at the heart.
January 30, 2010 |
|
Dubai - Development of Fireside scheme involving design and construction of (66) villas comprising four-six bedrooms with associated facilities.
January 30, 2010 |
|
Dubai - Construction of Lago Vista towers comprising two buildings consisting of (21) floors and a third building consisting of (24) floors of residential apartments, including tennis courts, swimming pool and health club.
January 30, 2010 |
|
Dubai - Design and construction of Emirates Gardens 1 comprising studios, one-two-bedroom apartments, including retail mall on the ground level, health club, gymnasium, roof garden and play area for children.
January 30, 2010 |
|
Dubai - Construction of 84-storey, 310-metre-high Ocean Heights 1 Tower comprising (680) residential apartments consisting of one-three bedrooms, including leisure facilities like gymnasium, sauna, steam room, games room, children's play area and a parking space to accommodate (700) vehicles.
January 30, 2010 |
|
Dubai - Construction of Pixel Tower comprising three basements, a ground floor and (21) upper storeys consisting of residential apartments, commercial space and villas.
January 30, 2010 |
|
Dubai - Construction of Smart Heights Tower comprising (24) storeys consisting of office space and retail outlets, including six levels of car parking facilities, a health club and day-care centre.
January 30, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract for the third phase expansion of Ruwais petrochemicals complex involving addition of further 2.5 million tonnes a year (t/y) of capacity.
January 30, 2010 |
|
Abu Dhabi - Engineering, procurement and construction management (EPCM) contract to build a hydrogen power plant, which will provide 420 MW of electricity to the grid, including a desalination plant with capacity of 20-25 million gallons a day using reverse osmosis technology.
January 30, 2010 |
|
Dubai - Construction of 15-storey XL Tower comprising a reception area, business centre, boardroom and conference facilities, including hi-speed Internet, gymnasium, health club, shopping outlets, security cameras, 24-hour security guard and cafes.
January 30, 2010 |
|
Dubai - Design and construction of 19-storey Business Tower comprising a reception area, business centre, boardroom and conference facilities, including high-speed Internet, gymnasium, health club, shopping outlets, security cameras, 24-hour security guard and cafes.
January 30, 2010 |
|
Dubai - Development of Tuscan Residence involving construction of (3 Nos.) five-storey buildings consisting of studio, one and two-bedroom apartments, each with their own balcony as well as other associated facilities.
January 30, 2010 |
|
Abu Dhabi - Development of a 130-kilometre-long, city-wide metro system.
January 30, 2010 |
|
Dubai - Design and construction of 30-storey Ariyana Tower comprising residential apartments, including three basements.
January 30, 2010 |
|
Sharjah - Construction and completion of an office building for a public works authority.
January 31, 2010 |
|
Abu Dhabi - Supply of Information Technology (IT) equipment for a health services authority.
January 31, 2010 |
|
Abu Dhabi - Provision of support services for an economic development authority.
January 31, 2010 |
|
Abu Dhabi - Organising of Gulf & World Consumer Day Exhibition.
January 31, 2010 |
|
Dubai - Construction of two to six-lanes dual carriageway covering three bridges spanning 900 metres connecting Palm Deira development to mainland.
January 31, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract to carry out de-bottlenecking of Thamama C gas plant for increasing sour gas handling capacity to 630 million cubic feet a day (cf/d) from 540 million cf/d.
January 31, 2010 |
|
Abu Dhabi - Construction of Guggenheim Abu Dhabi (GAD) world-class museum, which will be devoted to modern and contemporary art.
January 31, 2010 |
|
Al Ain - Provision of consultancy services for conducting studies related to posted speed limit signs at internal roads for a municipality.
January 31, 2010 |
|
Al Ain - Provision of consultancy services for conducting studies related to the improvement of pedestrian safety and movements for a municipality.
January 31, 2010 |
|
Abu Dhabi - Carrying out maintenance and improvement works of buildings related to a Critical National Infrastructure Authority.
February 1, 2010 |
|
Dubai - Design and construction of 80-storey, mixed-use tower comprising offices, a five-star hotel, furnished apartments, offices and luxurious apartments.
February 1, 2010 |
|
Abu Dhabi - Supply of personal computers and printers for a healthcare services authority.
February 1, 2010 |
|
Abu Dhabi - Carrying out maintenance and improvement of buildings related to a Critical National Infrastructure Authority.
February 1, 2010 |
|
Abu Dhabi - Provision of consultancy services for the development and enforcement of vehicle safety specifications and regulations for a transport authority.
February 1, 2010 |
|
Abu Dhabi - Provision of professional chartered quantity surveying services for a municipality.
February 1, 2010 |
|
Abu Dhabi - Provision of Marketing / Advertising / Promotion / Printing, Gifts & Road Safety / Eid & other Celebrations / Public Relations and Event Management Services for a municipality.
February 1, 2010 |
|
Abu Dhabi - Carrying out landscaping and associated works for a municipality.
February 1, 2010 |
|
Al Ain - Conducting feasibility assessment and urban concept design for redevelopment of a Municipal Depots Complex.
February 1, 2010 |
|
Abu Dhabi - Supply of Internet Protocol (IP) telephone system for a healthcare services authority.
February 1, 2010 |
|
Abu Dhabi - Design and construction of a cable-stay bridge, with the deck suspended from a 50-metre-high structural arch to connect two islands.
February 1, 2010 |
|
Sharjah - Engineering, procurement and construction (EPC) contract to build a fuel storage facility at a Free Zone comprising nine individual tanks with a total storage capacity for refined oil and gas products of 83,000 cubic metres.
February 1, 2010 |
|
Abu Dhabi - Construction of Seba Tower comprising three basement levels, a ground floor, a mezzanine floor, five parking levels and 55 additional floors.
February 1, 2010 |
|
Abu Dhabi - Provision of security guarding services for a financial authority.
February 1, 2010 |
|
Abu Dhabi - Development of Yas Island featuring a Ferrari theme park, a motor sports race track and three golf courses, including a water park, a shopping centre, hotels, two marinas, polo clubs and residential buildings.
February 1, 2010 |
|
Abu Dhabi - Carrying out cleaning of building and its Administrations for a financial authority.
February 1, 2010 |
|
Abu Dhabi - Carrying out maintenance and improvement works of buildings related to a Critical National Infrastructure Authority.
February 1, 2010 |
|
Abu Dhabi - Carrying out maintenance and improvement works of buildings related to a Critical National Infrastructure Authority.
February 1, 2010 |
|
Abu Dhabi - Supply of complete storage, servers and back-up solutions for a hospital.
February 2, 2010 |
|
Abu Dhabi - Construction of low density polyethylene (LDPE) plant with associated facilities and capacity of 4.5 million tonnes per year, as part of Borouge 3 complex.
February 2, 2010 |
|
Abu Dhabi - Provision of study, design consultancy and construction supervision services for the improvements of a road network.
February 2, 2010 |
|
Abu Dhabi - Construction of off-sites and utilities, as part of Borouge 3 complex.
February 2, 2010 |
|
Abu Dhabi - Supply of office furniture for the Administration Department in a hospital.
February 2, 2010 |
|
Abu Dhabi - Provision of consultancy services to carry out airport connectivity study and connectivity monitoring tool for a transport authority.
February 2, 2010 |
|
Dubai - Provision of security services for a health authority.
February 2, 2010 |
|
Abu Dhabi - Development and maintenance of Knowledge Engine Health (KEH) application for a health authority.
February 2, 2010 |
|
Abu Dhabi - Carrying out disposal and treatment of chemical waste at a hospital.
February 2, 2010 |
|
Dubai - Provision of security services for a hospital.
February 2, 2010 |
|
Northern Emirates - Development of copper cables factory to produce power distribution cables, power supply cables, cable trays, cross arms and accessories.
February 3, 2010 |
|
Abu Dhabi - Annual contract for supply of stationery materials and office items for a ministry.
February 3, 2010 |
|
Abu Dhabi - Provision of insurance of arsenals (Weapons & Ammunitions warehouses) for a ministry.
February 3, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract to carry out a major expansion of the existing seawater cooling system for an oil refining company.
February 3, 2010 |
|
Al Ain - Development of Ain Al Faydah mixed-use scheme comprising (7,593) residential units, which consist of (6,000) villas, including hotels, retail outlets and healthcare services, which will include centres of medicines, treatments and Chinese medicine centres.
February 3, 2010 |
|
Northern Emirates - Development of Park View scheme comprising sports facilities, open green areas, a shaded promenade, a mosque, multiple water features, a children's adventure playground and public BBQ facilities.
February 3, 2010 |
|
Dubai - Construction of 54-storey, 200-metre-high Iris Mist Tower comprising (355) luxury residential apartments consisting of one, two and three-bedroom units, six retail outlets and (28) units of office space.
February 3, 2010 |
|
Northern Emirates - Development of The Boulevard scheme involving design and construction of (12) residential buildings and two commercial buildings ranging from (14) to (30) storeys, as well as a three-level shopping mall, a five-star business hotel and more than (2,000) basement and podium parking spaces, including swimming pools, health clubs, a nursery and day care facilities.
February 3, 2010 |
|
Al Ain - Protection and fixing of broken and filled up rocky areas on a road for a municipality.
February 3, 2010 |
|
Al Ain - Commissioning, development and maintenance of rainwater pumping networks and stations for a municipality - (1).
February 3, 2010 |
|
Al Ain - Commissioning, development and maintenance of rainwater pumping network and stations for a municipality.
February 3, 2010 |
|
Abu Dhabi - Design and construction of new 110-metre-high headquarter building covering a gross floor area of 62,000 square metres incorporating a futuristic aluminium and glass exterior, underground parking, turnstile security, marble floors and walls.
February 3, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract for construction of facilities to capture and process up to 800,000 tonnes a year (t/y) of carbon dioxide (CO2) produced at a steel rolling mill.
February 3, 2010 |
|
Abu Dhabi - Provision of insurance services of non-weapons and ammunition warehouses for a ministry.
February 3, 2010 |
|
Abu Dhabi - Provision of insurance services of General Administration Warehouses of Electronics & Telecommunications Services for a ministry.
February 3, 2010 |
|
Al Ain - Supply of methyl bromide gas for a palm cultivation development company.
February 3, 2010 |
|
Al Ain - Provision of security staff and auditors for the sites of a palm cultivation development company.
February 3, 2010 |
|
Al Ain - Provision of external auditor services for auditing the financial data relating to the project of management and commissioning contract of a Beach Club for a municipality.
February 3, 2010 |
|
Al Ain - Supply of plastic boxes for a palm cultivation development company.
February 3, 2010 |
|
Al Ain - Provision of unskilled Asian manpower for a palm cultivation development company.
February 3, 2010 |
|
Abu Dhabi - Supply of various kinds of vehicles for a ministry.
February 3, 2010 |
|
Al Ain - Provision of transportation and consignment of dates products during the season for a palm cultivation development company.
February 3, 2010 |
|
Al Ain - Provision of pest control services for a palm cultivation development company.
February 3, 2010 |
|
Abu Dhabi - Design and construction of Bloom Gardens residential community comprising over 300 villas and penthouses, including a preparatory school, a spa, gymnasium and some retail outlets.
February 3, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract to develop Shuweihat S3 Independent Water and Power Plant (IWPP) with capacity of 1,600 MW and 100 million gallons a day.
February 3, 2010 |
|
Dubai - Carrying out civil inspection and repair works of cable tunnels at the power plant area for an aluminium company.
February 4, 2010 |
|
Abu Dhabi - Supply of (17 Nos.) big quantities of medical requisites for a health authority.
February 4, 2010 |
|
Abu Dhabi - Construction and design of Commercial Centre (GFA of 40,000m2) for a housing & services facilities development authority.
February 4, 2010 |
|
Dubai - Construction of 108-storey, 510-metre-high Burj Al Alam Tower comprising offices, a shopping mall and a five-star hotel.
February 4, 2010 |
|
Abu Dhabi - Design and construction of Hydra Heights Towers comprising three residential buildings, each consisting of (30) storeys, including associated facilities.
February 4, 2010 |
|
Abu Dhabi - Supply of medical requisites (anti-lice shampoo) for a health authority.
February 4, 2010 |
|
Abu Dhabi - Supply of (350,000 pcs.) Lanets (adults), (150,000 pcs.) Lanets (pediatric), (150,000 pcs.) Capillary Tubes and (500,000 pcs.) Caps for a health authority.
February 4, 2010 |
|
Abu Dhabi - Printing and supply of target papers (for shooting) to a ministry.
February 4, 2010 |
|
Abu Dhabi - Printing and supply of the items for a ministry.
February 4, 2010 |
|
Dubai - Design and construction of MRO Centre that will form a part of Dubai World Central development (formerly Jebel Ali Airport City project).
February 7, 2010 |
|
Northern Emirates - Carrying out modification of SWRO pre-treatment system at a plant.
February 7, 2010 |
|
Abu Dhabi - Development of Al-Bustan mixed-use scheme comprising (5 Nos.) 17-storey towers, a four-star hotel, office tower, serviced apartments, retail and food outlets, including a five-storey car park.
February 7, 2010 |
|
Sharjah - Engineering, procurement and construction (EPC) contract to build a steel factory at Hamriya Free Zone with capacity of 1 million tonnes per annum of reinforced steel.
February 7, 2010 |
|
Abu Dhabi - Supply of big and small sizes of paper sacks, pens and plastic pen sets with the logo of International Day Celebration for a civil defence authority.
February 7, 2010 |
|
Abu Dhabi - Construction of new headquarters for Abu Dhabi Tourism Authority (ADTA) / Tourism Development & Investment Company (TDIC) comprising three inter-linked office buildings consisting of ground plus 8 floors, ground plus four floors and ground plus five floors, including three floors of basement car park with a total gross floor area of approximately 114,000 square metres.
February 7, 2010 |
|
Abu Dhabi - Carrying out landscaping of gardens and follow up of maintenance works required for the gardens surrounding (20) villas.
February 7, 2010 |
|
Dubai - Development of Acacia Avenues mixed-use scheme comprising two residential towers containing (137) serviced apartments and (50 Nos.) six-bedroom villas.
February 7, 2010 |
|
Dubai - Development of Universal City comprising hotels providing 4,000 luxury rooms, 100 restaurants, retail outlets, commercial office, universal parks and resorts, Universal Studios and residential compounds.
February 7, 2010 |
|
Abu Dhabi - Design and construction of a headquarter building comprising offices, condominiums and retail space within Masdar City development - Phase 1.
February 8, 2010 |
|
Al Ain - Provision of Antivirus and Security Licenses for a hospital.
February 8, 2010 |
|
Abu Dhabi - Design and construction of Gateway Towers comprising (6 Nos.) mixed-use buildings, including associated facilities.
February 8, 2010 |
|
Dubai - Design and construction of Madison Residency comprising a four-storey, low-rise building offering residential apartments and mixed-use retail facilities.
February 8, 2010 |
|
Al Ain - Supply of Urodynamic machine for a hospital.
February 8, 2010 |
|
Dubai - Carrying out expansion of hotel involving addition of a seven-storey building comprising (240) beds, including a theatre.
February 8, 2010 |
|
Dubai - Design-and-build contract for construction of Al-Sufouh tram system comprising a total of (19) stations.
February 8, 2010 |
|
Abu Dhabi - Development of Masdar City on a six-square-kilometre area comprising a university, commercial, residential and eco-friendly industrial areas.
February 8, 2010 |
|
Abu Dhabi - Engineering, procurement and construction (EPC) contract to develop two onshore gas fields.
February 8, 2010 |
|
Northern Emirates - Development of Julfar Towers involving construction of (2 Nos.) 45-storey buildings comprising (349) apartments, (468) offices and about (1,500) parking spaces for vehicles.
February 8, 2010 |
|
Abu Dhabi - Design and construction of 65-storey Sun Tower comprising (673 Nos.) one, two, three and four-bedroom luxury suites and penthouses, including car parking facilities, a shopping mall, fitness and leisure centre and a range of cafes and restaurants.
February 8, 2010 |
|
Abu Dhabi - Design and construction of five-star Movenpick Hotels & Resorts comprising (300) rooms.
February 8, 2010 |
|
Abu Dhabi - Development of Shah onshore gas field involving extraction of sour gas reserves.
February 8, 2010 |